Actalent · American Electric PowerEngineering
SCADA & Fiber Network Modernization
SCADA enhancement and fiber connectivity across a 500-mile AEP service area — 30% reliability improvement, 15% downtime reduction.
Overview
As Telecommunication Planning Engineer at Actalent Engineering Services (Ohio, Jan 2022–Feb 2024), led SCADA network enhancement and fiber connectivity design for American Electric Power across a 500-mile service area.
Problem Statement
Legacy SCADA links and inconsistent fiber connectivity were driving operational risk and monitoring gaps across a multi-state utility footprint.
Constraints & Stakeholders
Constraints
- ▸Multi-jurisdiction utility footprint
- ▸Field coordination across contractors
- ▸Legacy infrastructure constraints
Stakeholders
- ▸AEP Transmission & Telecom
- ▸Field Engineering
- ▸Contractors
- ▸Actalent PMO
Approach & Methodology
- 1Led SCADA network enhancement initiatives to improve infrastructure reliability and operational efficiency
- 2Designed fiber connectivity solutions and optimized telecom network layouts across a 500-mile service area
- 3Conducted site surveys, built telecom engineering models, and coordinated with field teams on implementation
- 4Drove proactive network planning that reduced operational downtime
Timeline
Design
Site surveys and telecom engineering models
Build
Fiber and SCADA connectivity rollout
Sustain
Reliability tuning and operational handoff
Deliverables
- Telecom design packages
- Site survey reports
- Network optimization plans
KPIs & Results
30%
Reliability improvement
15%
Downtime reduction
500 miles
Service area
Lessons Learned
- ▸Field-verified designs beat desk-verified designs — every time.
- ▸Utility networks reward proactive planning; they punish reactive fixes.